Horizontal Directional Drilling requires precise bore positioning and the ability to navigate beneath rivers, roads, railways, and other critical infrastructure. From initial design through field execution, our team supplies the equipment, software, personnel, and operational expertise needed to keep your project on track, on schedule, and within budget.
Our experienced engineers, field personnel, and drilling crews work to:
- Optimize your drilling operations
- Provide you with outstanding services
- Increase your productivity
- Eliminate your downtime
- Adapt to your changing needs
Our family of companies has over 50 years’ continuous experience with portfolio companies, State-Owned Enterprises and with some of the largest Fortune 500 companies in the world on mega-projects assignments such as:
- 12" NB (2.0 km) Gas Pipeline across a major river by Horizontal Directional Drilling and the associated works.
- 24” & 6” (2,325 meters) pipeline installation across a major river by Horizontal Directional Drilling and the associated works.
- 28” (250 to 750 meters) OD, 0.5” WT, API 5L Grade X-70 Installation of 28” OD pipeline across 45 River/Distributary/Channel/Canal/Nala/Roads including seven crossings. As well as a de-bottlenecking pipeline project by Horizontal Directional Drilling and associated works.
- Installation of 28” (870 meters) OD Pipeline across Navigational Channel of port by Horizontal Directional Drilling and the associated works. As well as the construction of trestle, piping and associated works for crude oil pipeline from a new oil jetty to the tank farm.
Login